Production Information:
|
| Designer: |
Peter Graves |
| Shop: |
Arizona Opera |
| Technical Director: |
William Collister |
| First Production: |
| Conductor: |
Richard Buckley |
| Lighting Designer: |
Cindy Stillings |
| Costumes: |
Malabar Ltd. |
| Stage Director: |
Garnett Bruce |
| Stage Manager: |
Tracy Davis |
Director has first right of refusal. All costs associated with director accepting to direct are responsibility of renting company. If director is not hired to direct then see Director fee listed below.
Rental Costs:
|
| Set Rental: |
| Fee: |
$12,000.00 |
| Security Desposit: |
$2,000.00 |
| Amount of insurance required: |
$125,000.00 |
|
| Set Technician: |
| The Cleveland Opera requires a Set Technician to accompany rental scenery to all load-ins, set-ups, strikes, and load-outs. The cost of the Set Technician is the responsibility of the renting company. Set Technician fees break down as follows : |
| Fee: |
$250.00 per day including travel days |
| Per Diem: |
$65.00 per day including travel days |
| Round Trip Air Fare |
Provided by renter |
| Hotel Accomodations: |
Provided by renter |
| Transportation to/from Airport: |
Provided by renter |
|
| Load-in/Load-out: |
| Warehouse Cost: |
$2,500.00 |
| Number of Vans: |
2* |
| Size of Vans: |
53′ Air Ride |
| 30 day notice required for loading |
| All vans must be equipped with straps (12), load bars (10) and blankets (36) |
| NO RAIL SHIPPING ALLOWED |
|
Crew Requirements:
|
| In Cleveland, the following crew sizes were used. Crew sizes may vary for the renting company, depending on its schedule, the size of its theatre, etc. |
|
Set Up |
Running |
Strike |
| Stage Carpenters |
10 |
4 |
12 |
| Fly Men |
2 |
2 |
2 |
| Stage Properties |
2 |
3 |
4 |
| Stage Electricians |
14 |
2/4 |
12 |
| Carloaders |
4 |
|
6 |
| Approximate Time |
12 hrs |
|
5 hrs |
|
| The figures above represent union crewpersons and include a required house crew of 6 stagehands.
The scenery was constructed by union personnel for stagione presentation. |
Set Technical Information:
| Minimum Width: |
86′ |
| Minimum Depth: |
40′ |
| Total Number of Line Sets: |
|
| Line Sets for Scenery: |
13 |
| Line Sets for Electricity: |
13 (including 4 focus tracks) |
| Line Sets for Masking: |
12 |
| Furthest Upstage Flying Piece: |
19′1″ |
| Weight of Heaviest Flyer: |
300 lbs Temple drop |
| Height fo Tallest Drop |
30′9″ temple drop |
| Tripping of Drops Permitted? |
no |
| Dimensions of Largest Soft Flying Piece: |
30′h x 68′ garden drop |
| Dimensions of Largest Hard Flying Piece: |
|
| Dimensions of Largest Standing Piece: |
4′h x 4′d x 12′h Act I Columns |
| Number of Ground Cloth(es): |
0 |
| Hardware Available with Rental: |
Assembly, Specialty |
| Weight of Scenery for Shipping: |
|
Original / Home Theatre Information:
In Cleveland, the production was presented at the State Theatre, which is described below:
| Wall to Wall Width : |
116′0″ |
Stage Depth (p.l. to back wall) : |
68′ 0″ |
| Width within Stagehouse : |
110′0″ |
Grid Depth (p.l. to last line) : |
65′ 0″ |
| Wing Width SR : |
19′ x 56′ |
Height of Grid : |
90′ 0″ |
| Stage PropertiesWing Width SL : |
13′ x 56′ |
Number of Line Sets : |
82 |
| Depth of Apron : |
5′3″ |
Load Capacity of Lines : |
1500 lbs |
| Width of Proscenium : |
50′6″ |
Size / # of Loading Doors : |
3 @ 7′ x 8′ 7″ |
| Height of Proscenium : |
28′0″ |
Offstage Storage Spaces : |
U.S.C. 35′ x 35′ |
Projection and Special Effects Information:
| Projection / Special Effects Equipment Used : |
none |
| Projection / Special Effects Available with Rental : |
No |
| Title Projections Available with Rental : |
No |
| Title Projection System Used : |
Sharp LCD/PowerPoint |
Production Materials Sent:
| Auto CAD File |
x on CD |
| Floor Plans (1/8″) |
x |
| Sections (1/8″) |
x |
| Elevations |
x |
| Production Photos |
x on CD |
| Appendix 1 |
x on CD |
| Production Photos |
x on CD |
| Hanging Plot |
x on CD |
| Deck Running Sheet |
x on CD |
| Prop Running Sheet |
x on CD |
| Prop List |
x on CD |
Please Note : If the inquiring company should elect not the use the production, then all production materials must be returned within sixty (60) days. If the production is used, all production materials must be returned within thirty (30) days of the final performance. A payment of fifty dollars ($50) will be required for materials not returned.
Turandot
Production Information:
Rental Costs:
Crew Requirements:
The scenery was constructed by union personnel for stagione presentation.
Set Technical Information:
Original / Home Theatre Information:
In Cleveland, the production was presented at the State Theatre, which is described below:
Projection and Special Effects Information:
Production Materials Sent:
Please Note : If the inquiring company should elect not the use the production, then all production materials must be returned within sixty (60) days. If the production is used, all production materials must be returned within thirty (30) days of the final performance. A payment of fifty dollars ($50) will be required for materials not returned.